HDA11 - Project Baseline
HDA11 - Project Baseline
With version 11.2 of HDA, Baseline feature was introduced in Projects Management.
Baseline is a snapshot of the state of the project created at a given time so that it can be kept as a historical reference as the project evolves.
When the project goes from a design state to an approval state the baseline is created by saving the current data of the project and its component tasks.
This information will be visible in the Gantt, and if tasks are moved or lengthened, thus changing what was planned, there can be feedback on these changes compared to the planning that was done at the time the project was approved.
, multiple selections available,